Amplify Me: AI Toolkit for Project Managers

Practical AI tools to help you think clearer, work smarter, manage projects, and make better decisions.

Choose an AI tool for your task. Copy a useful prompt. Put it to work with your judgment.

For project and programme managers. No account needed to use this resource.

01 / Choose your starting point

Find the right AI for your task

AI can amplify your research, analysis, planning, documentation and execution. You remain accountable for the decisions and results. Start with the job you need to do.

Curated starting points, not permanent rankings. Features, access, limits and organizational approvals vary by plan and administrator settings.

Browse the task guides below. With JavaScript enabled, you can select one task at a time.

Research a project or unfamiliar topic

Start with the question, the decision it informs and the evidence you need.

Perplexity

Find public sources and build an evidence trail before drawing conclusions.

Strength: Discover web sources and investigate questions with linked citations.

Limitations & official guidance

A citation is a starting point: read the original and check that it supports the claim.

Official Perplexity search guide

ChatGPT

Frame the investigation and compare findings; request links for factual claims.

Strength: Explore plans, analyze information and develop alternatives through conversation.

Limitations & official guidance

Outputs can contain unsupported claims or incorrect calculations. Check evidence and working.

Official ChatGPT guidance

Verify before using: Open primary sources, check publication dates and separate evidence from interpretation.

Develop a project plan

Provide outcomes, constraints and known dates. Ask for missing inputs before estimates.

ChatGPT

Explore scope, milestones, dependencies and alternative delivery approaches.

Strength: Explore plans, analyze information and develop alternatives through conversation.

Limitations & official guidance

Outputs can contain unsupported claims or incorrect calculations. Check evidence and working.

Official ChatGPT guidance

Claude

Turn an agreed approach into a clear planning document.

Strength: Develop and revise written material, synthesize context and reason through options.

Limitations & official guidance

A clear narrative can still contain factual errors or overlook missing context.

Official Claude overview

Microsoft Copilot

Develop planning materials within approved Microsoft 365 workflows.

Strength: Work with documents and information in the Microsoft 365 environment where enabled.

Limitations & official guidance

Consumer and work experiences differ; app access depends on licensing and administrator settings.

Official Microsoft Copilot guide

Verify before using: Validate assumptions, dependencies and estimates with the people responsible for delivery.

Identify project risks

Describe the delivery environment and invite challenge, not just a generic risk list.

Claude

Challenge the proposed approach and develop concrete risk scenarios.

Strength: Develop and revise written material, synthesize context and reason through options.

Limitations & official guidance

A clear narrative can still contain factual errors or overlook missing context.

Official Claude overview

ChatGPT

Explore failure modes, warning signs and possible mitigations.

Strength: Explore plans, analyze information and develop alternatives through conversation.

Limitations & official guidance

Outputs can contain unsupported claims or incorrect calculations. Check evidence and working.

Official ChatGPT guidance

Verify before using: Validate risk likelihood, impact and ownership with your team; check external claims against sources.

Analyze project data

Use approved, minimized data. State units, definitions, reporting periods and known gaps.

Gemini

Explore supported files and identify questions for further analysis.

Strength: Summarize and explore approved documents, spreadsheets and other supported files.

Limitations & official guidance

File limits and Workspace access vary. Independently reconcile figures and inspect original documents.

Official Gemini file guidance

Microsoft Copilot

Work with approved Microsoft 365 materials where your organization enables access.

Strength: Work with documents and information in the Microsoft 365 environment where enabled.

Limitations & official guidance

Consumer and work experiences differ; app access depends on licensing and administrator settings.

Official Microsoft Copilot guide

ChatGPT

Develop analysis steps and explain patterns in the information provided.

Strength: Explore plans, analyze information and develop alternatives through conversation.

Limitations & official guidance

Outputs can contain unsupported claims or incorrect calculations. Check evidence and working.

Official ChatGPT guidance

Verify before using: Recalculate important figures, reconcile totals and examine missing values and outliers.

Write reports or documentation

Specify the audience, purpose, source material and decisions the document must support.

Claude

Shape a coherent draft and revise it for clarity and audience.

Strength: Develop and revise written material, synthesize context and reason through options.

Limitations & official guidance

A clear narrative can still contain factual errors or overlook missing context.

Official Claude overview

Microsoft Copilot

Prepare documents within existing approved Microsoft 365 processes.

Strength: Work with documents and information in the Microsoft 365 environment where enabled.

Limitations & official guidance

Consumer and work experiences differ; app access depends on licensing and administrator settings.

Official Microsoft Copilot guide

ChatGPT

Test the structure and refine the explanation before release.

Strength: Explore plans, analyze information and develop alternatives through conversation.

Limitations & official guidance

Outputs can contain unsupported claims or incorrect calculations. Check evidence and working.

Official ChatGPT guidance

Verify before using: Check every date, figure, attribution and commitment against approved records.

Manage stakeholder communications

Identify who needs to know what, the required response and who approves the message.

Claude

Adapt tone and detail for different audiences without changing the facts.

Strength: Develop and revise written material, synthesize context and reason through options.

Limitations & official guidance

A clear narrative can still contain factual errors or overlook missing context.

Official Claude overview

Microsoft Copilot

Prepare communication materials in the organization's approved work environment.

Strength: Work with documents and information in the Microsoft 365 environment where enabled.

Limitations & official guidance

Consumer and work experiences differ; app access depends on licensing and administrator settings.

Official Microsoft Copilot guide

Verify before using: Review tone, confidentiality and commitments. A responsible person approves and sends messages.

Develop software

Provide acceptance criteria and boundaries. Begin in an isolated branch or development environment.

Codex

Inspect an implementation, make scoped changes and verify the result.

Strength: Inspect code, implement focused changes and support software development workflows.

Limitations & official guidance

Changes and commands need review, tests and scoped access before production use.

Official Codex resources

Claude Code

Work through development tasks using repository context and tools.

Strength: Work through codebase tasks using a development environment and supporting tools.

Limitations & official guidance

Review filesystem changes and commands. Use a safe environment and explicit release approvals.

Official Claude Code guide

GitHub Copilot

Support developers in their existing coding and review workflow.

Strength: Assist with code, codebase questions and review within development workflows.

Limitations & official guidance

Suggestions require developer review, security checks and tests; available features vary.

Official GitHub Copilot guide

Verify before using: Review diffs, run relevant tests and security checks, and obtain deployment approval.

Automate repetitive work

Document the manual process, permissions, failure handling and required approval points first.

Codex

Build and test a small script or integration from an agreed process.

Strength: Inspect code, implement focused changes and support software development workflows.

Limitations & official guidance

Changes and commands need review, tests and scoped access before production use.

Official Codex resources

Claude Code

Implement a repeatable workflow with explicit checks and recovery behavior.

Strength: Work through codebase tasks using a development environment and supporting tools.

Limitations & official guidance

Review filesystem changes and commands. Use a safe environment and explicit release approvals.

Official Claude Code guide

GitHub Copilot

Assist a developer implementing and reviewing automation code.

Strength: Assist with code, codebase questions and review within development workflows.

Limitations & official guidance

Suggestions require developer review, security checks and tests; available features vary.

Official GitHub Copilot guide

Verify before using: Test synthetic examples, permissions, duplicates and recovery before allowing real actions.

Challenge assumptions and decisions

Ask for the strongest counterargument and what evidence would change the recommendation.

ChatGPT

Explore alternatives and test the reasoning behind a decision.

Strength: Explore plans, analyze information and develop alternatives through conversation.

Limitations & official guidance

Outputs can contain unsupported claims or incorrect calculations. Check evidence and working.

Official ChatGPT guidance

Claude

Review the argument for hidden assumptions and missing evidence.

Strength: Develop and revise written material, synthesize context and reason through options.

Limitations & official guidance

A clear narrative can still contain factual errors or overlook missing context.

Official Claude overview

Perplexity

Look for external evidence that supports or contradicts the case.

Strength: Discover web sources and investigate questions with linked citations.

Limitations & official guidance

A citation is a starting point: read the original and check that it supports the claim.

Official Perplexity search guide

Verify before using: Verify consequential claims and retain the human decision rationale, including uncertainty.

Improve personal productivity

Start with a specific bottleneck and a small, reversible improvement.

Microsoft Copilot

Explore improvements within approved Microsoft 365 work practices.

Strength: Work with documents and information in the Microsoft 365 environment where enabled.

Limitations & official guidance

Consumer and work experiences differ; app access depends on licensing and administrator settings.

Official Microsoft Copilot guide

ChatGPT

Break a workload into priorities and practical next steps.

Strength: Explore plans, analyze information and develop alternatives through conversation.

Limitations & official guidance

Outputs can contain unsupported claims or incorrect calculations. Check evidence and working.

Official ChatGPT guidance

Gemini

Summarize approved materials and reduce repeated document review.

Strength: Summarize and explore approved documents, spreadsheets and other supported files.

Limitations & official guidance

File limits and Workspace access vary. Independently reconcile figures and inspect original documents.

Official Gemini file guidance

Verify before using: Check priorities and deadlines against the source of truth; approve any action in connected systems.

Choose an approved environment. Follow your employer’s AI policy before sharing any work information. Check the exact product, account, permissions and data handling with your organization. A recommendation here is not permission to upload confidential material. This resource needs no account; external AI tools may require one or a paid plan.

02 / Put it to work

Project management prompt library

Replace the brackets with approved project context. Ask the AI to clarify what is missing, then review its work. These prompts help you start a useful conversation; they do not authorize actions.

Open a prompt to read it. Copy buttons copy the complete text. You can also select and copy the text manually.

10 prompts available.

01 / Plan

Project definition and scope

Before work begins, turn an idea into a scope that can be agreed and tested.

Read & customize this prompt

Replace the context with a short approved brief and name the person who accepts each deliverable.

Act as a project planning partner. Help me define this project before suggesting a delivery plan.

Context: [business problem, intended users, desired outcome, sponsor, constraints and existing evidence].

First identify missing information and ask up to five questions that could materially change the scope. If I cannot answer, label the gaps; do not invent facts, commitments, budgets or dates.

Using only the supplied facts, draft: problem statement; measurable outcomes; in-scope deliverables; explicit exclusions; constraints; assumptions requiring validation; and acceptance criteria for each deliverable. Distinguish outputs from the benefits they are meant to create.

Identify ambiguous terms, conflicting expectations and decisions the sponsor must make. Show how a proposed scope change would be assessed and approved. Finish with the smallest useful next step and an approval checklist. Treat this as a draft for human review, not an authorized project baseline.

02 / Plan

Work breakdown and milestones

Build a useful delivery structure after scope is understood.

Read & customize this prompt

Supply the actual working calendar and known availability; validate sequencing with delivery leads.

Act as a delivery planner. Break the agreed scope into manageable work packages and reviewable milestones.

Inputs: [approved outcomes, deliverables, exclusions, required dates, available team and working calendar].

Ask about any missing acceptance criteria, specialist skills or mandatory approvals before estimating. Do not invent task owners, capacity or fixed durations. Where estimates are necessary, use clearly labeled ranges and explain their basis.

Produce a table with work package, observable output, proposed accountable role, predecessor, acceptance test, estimated effort range and confidence. Separate effort from elapsed time. Include review, integration, testing, handover and operational readiness work.

Identify milestone exit criteria and the dependencies that could determine completion. Flag tasks that can run in parallel only if capacity permits. Show which dates are constraints versus provisional forecasts. End with sequencing decisions for the team and the evidence needed to turn this into an approved schedule.

03 / Plan

Risk identification

Find specific uncertainties and early warnings before they become issues.

Read & customize this prompt

Add your organization’s risk definitions and escalation thresholds before prioritizing.

Act as a constructive project risk reviewer. Review this proposed project and identify material risks, not a generic checklist.

Context: [objectives, delivery approach, dependencies, stakeholders, constraints and known issues].

Ask clarifying questions where missing facts would change the assessment. Distinguish a future uncertainty from an issue that has already occurred. Do not assign numerical probabilities without evidence.

For each risk, state cause, uncertain event and potential effect on an objective. Include a proposed owner role, early warning signal, prevention or mitigation, contingency and decision trigger. Cover delivery, people, integration, suppliers, security, adoption and operational handover where relevant.

Explain the basis of any qualitative likelihood and impact judgment. Mark assumptions and unknowns. Identify correlated risks and mitigations that could create new risks. Prioritize the few risks that need attention now and name the evidence or expert review needed. Finish with questions for the project team to validate the register.

04 / Plan

Dependencies and bottlenecks

Understand what must happen first and where delivery can stall.

Read & customize this prompt

Provide actual supplier commitments and interface acceptance criteria; keep proposed dates clearly labeled.

Act as a systems-minded delivery reviewer. Examine this work plan for dependencies and bottlenecks.

Inputs: [work packages, milestones, interfaces, external teams, supplier commitments, approvals and known capacity].

Identify missing dependency information before making claims about the critical path. Do not infer confirmed commitments from proposed dates. Separate internal sequencing, external dependencies and resource constraints.

Create a dependency register with provider, consumer, required output, acceptance condition, needed-by date if known, commitment status, proposed owner role and fallback. Flag cycles, single points of failure, long approval lead times and integration work that is easy to overlook.

Show which bottlenecks are supported by evidence and which are hypotheses. Explore options to decouple work or reduce waiting, explaining cost, quality and coordination trade-offs. Do not claim a calculated critical path without a complete network and valid durations. End with the three coordination conversations most likely to reduce uncertainty.

05 / Deliver

Schedule recovery

Compare credible recovery options when a milestone is slipping.

Read & customize this prompt

Include the actual remaining-work estimate and contractual constraints; keep recovery proposals unapproved until reviewed.

Act as a project recovery planning partner. Help me evaluate options for a delayed project without assuming overtime or reducing quality.

Current evidence: [approved baseline, actual progress, remaining work, reason for delay, capacity, dependencies and non-negotiable constraints].

First ask for missing information needed to distinguish a reporting error from a real forecast change. Do not treat percentage complete as proof of remaining effort.

Explain the delay drivers and separate facts from hypotheses. Compare options such as resequencing, reducing approved scope, phased release, resolving dependencies, adding suitable capacity or moving the date. For each option, state prerequisites, likely benefit range, cost or capacity implications, quality and safety effects, and risks.

Identify what requires sponsor approval and what can be tested reversibly now. Avoid unsupported promises that more people will immediately accelerate delivery. Recommend a short recovery experiment with a review date, observable success criteria and a fallback. Draft a transparent stakeholder update with no invented commitments.

06 / People

Stakeholder communications

Tailor a clear message without changing facts or making new commitments.

Read & customize this prompt

Name the audience and desired response. Remove personal or confidential details before using an unapproved tool.

Act as a project communications adviser. Prepare communication drafts appropriate to the audiences below.

Inputs: [verified project status, decision needed, stakeholder groups, concerns, channels and approval process].

Ask about unclear facts, audience needs or sensitive information before drafting. Use only approved information. Do not invent quotations, agreement, progress or promises. Where details are missing, use a visible placeholder.

Create a concise communication plan showing audience, purpose, information needed, proposed channel, cadence and accountable approver. Then draft one executive update and one delivery-team update using the same underlying facts.

Separate completed work, current issues, future risks and decisions requested. State the action needed, decision owner and real deadline if supplied. Explain any uncertainty in plain language and avoid blame. Identify information that should be restricted to a smaller audience. Finish with a fact-check and approval checklist. These are drafts; do not send messages or commit anyone to an action.

07 / People

Resource and capacity planning

Expose overload and skill constraints before assigning more work.

Read & customize this prompt

Supply a real reporting period and unit definitions. Recalculate totals independently.

Act as a capacity planning partner. Assess whether this delivery plan fits the team’s realistic availability.

Inputs: [work demand, effort estimates, skills required, allocation by person or role, leave, support duties, working hours and reporting period].

Ask for missing units or availability assumptions. Do not equate headcount with usable capacity or invent individual productivity ratings. Use anonymized roles where practical.

Show demand and capacity in consistent units and explain each calculation. Account for recurring operational work, coordination and known absence without double counting. Identify overload periods, specialist bottlenecks and dependencies on one person. Distinguish a skill gap from a total-capacity gap.

Compare options: resequence, stop lower-priority work, adjust scope, build skills or add appropriate capacity. Explain onboarding and coordination costs rather than assuming instant productivity. Label uncertain estimates and show a simple sensitivity range. End with decisions for the manager and a plan to validate the numbers with the team before changing assignments.

08 / Improve

Challenging assumptions

Test the reasoning behind a preferred approach before committing.

Read & customize this prompt

Include the strongest evidence against your preferred option, not just the supporting case.

Act as a constructive critical reviewer of this project decision. Your job is to improve the reasoning, not agree with me or argue for its own sake.

Proposal: [decision, desired outcome, alternatives considered, evidence, constraints and why I currently favor it].

Summarize the strongest version of the proposal first. Then separate established facts, interpretations, assumptions and unknowns. Ask for missing evidence that could change the decision.

Identify the most consequential assumptions and how each could be tested. Present the strongest counterargument and at least two credible alternatives, including doing less or delaying commitment where appropriate. Examine second-order effects, reversibility, stakeholder impacts and likely failure scenarios.

State what evidence would support, weaken or overturn the preferred option. Do not fabricate research or claim consensus. If external evidence is needed, specify the question and the kind of primary source required. Finish with a balanced recommendation, confidence limits and a decision checkpoint for human approval.

09 / Deliver

Project status analysis

Turn inconsistent updates into a defensible view of delivery.

Read & customize this prompt

Provide agreed status thresholds and the reporting cutoff date; check source evidence behind each milestone.

Act as a project status analyst. Review the supplied reporting evidence and help me identify what requires attention.

Inputs: [reporting date, approved baseline, milestone evidence, actual progress, issues, risk register, spend if relevant and previous report].

Identify conflicting dates, missing evidence and inconsistent definitions before rating the project. Do not infer successful delivery from activity counts or invent a traffic-light status without agreed criteria.

Summarize outcome progress, completed and accepted deliverables, forecast changes, material issues, future risks and decisions required. Distinguish a verified fact from an estimate or unsupported assertion. Explain changes since the previous report and whether the comparison uses the same basis.

Check arithmetic and show the working for important figures. Flag data you cannot reconcile. Recommend a status only against the supplied thresholds; otherwise explain what is needed to assess it. Produce a short executive summary and an action table with proposed owner roles and deadlines only where documented. Require human validation before distribution.

10 / Improve

Lessons learned and continuous improvement

Turn delivery experience into changes the next team can use.

Read & customize this prompt

Include positive outcomes and dissenting views. Confirm the final learning record with participants.

Act as a neutral retrospective facilitator. Help this team learn from project evidence without assigning blame or inventing motivations.

Inputs: [intended outcomes, actual results, key decisions, timeline, feedback, incidents and constraints].

Ask for important gaps and separate observed events from opinions. Preserve disagreement where evidence does not settle the point. Do not claim a root cause simply because two events occurred together.

Identify what worked, what did not, unexpected outcomes and conditions that influenced results. For each candidate lesson, link it to supplied evidence, explain where it may apply again and note limits or competing explanations.

Convert the most useful lessons into a small number of actionable experiments. Specify a proposed owner role, process change, measurable signal, review point and what would make us stop or adapt. Include practices worth preserving. Finish with a concise handoff for future project teams and questions for participants to validate before the lessons are recorded as agreed institutional learning.

03 / From idea to impact

One leader. A coordinated AI team.

Michael Garrett uses named AI collaborators for different kinds of work. This is one real-world operating model, not a requirement to use these products. The useful principle: give each task clear context, an output and a review point.

  1. Frame the ideaMerlin (ChatGPT) helps explore strategy, reason through choices and challenge the initial idea.
  2. Research the evidenceArgus (Perplexity) helps discover sources. Michael checks what the evidence actually establishes.
  3. Shape the planMichael and Merlin turn findings into outcomes, constraints and a proposed approach.
  4. Document the decisionAthena (Claude) helps develop clear writing and documentation from agreed facts.
  5. Build and verifyCarl supports systems and software development against an agreed scope and acceptance criteria.
  6. Follow throughBetty, Chief of Staff, helps monitor commitments and identify follow-up needs.

Michael leads, approves and remains accountable. AI actions and consequential decisions require human review and approval. Each handoff carries the relevant evidence, decisions and unresolved questions.

04 / Keep the project coherent

Memory is a tool, not a strategy

A long conversation is not a project record. Give your team and your AI collaborators an explicit source of truth they can check.

Maintain a project brief

Keep outcomes, scope, constraints and acceptance criteria in an authoritative document. Record its owner and current version.

Record decisions

Capture what was decided, by whom, when, why and using which evidence. Keep proposed decisions visibly separate from approvals.

Track assumptions

Give each material assumption a validation step. Record dependencies, owners and commitment status.

Keep authoritative files

Use controlled source files and clear versions. Resolve conflicting copies before asking AI to continue.

Prepare a handoff

State completed work, verification evidence, open issues, next action and approval boundaries. Link back to original sources.

Check conversational memory

Use summaries as navigation aids. Recheck important facts and decisions against the project record instead of assuming they were remembered correctly.

Project-context handoff template

PROJECT CONTEXT — update before each handoff
Project and intended outcome: [ ]
Authoritative files and current versions: [ ]
Verified facts and supporting sources: [ ]
Approved decisions, dates and rationale: [ ]
Constraints and permission boundaries: [ ]
Assumptions awaiting validation: [ ]
Dependencies, owners and commitments: [ ]
Work completed and evidence of verification: [ ]
Open issues and unresolved questions: [ ]
Next action and acceptance criteria: [ ]
Actions requiring human approval: [ ]

Read the authoritative material first. Identify contradictions or missing access. Do not treat a previous chat summary as an approved decision. Ask before irreversible or out-of-scope actions. Report what you verified and what remains uncertain.

05 / Improve the decision

Better questions, better decisions

  1. What must be true for this plan to work, and which assumptions have we tested?
  2. What evidence is missing, weak or inconsistent?
  3. What would change our recommendation?
  4. What is the strongest argument against our preferred approach?
  5. Which alternative would achieve the outcome with less cost, complexity or commitment?
  6. If this fails, what is the most likely reason?
  7. Which dependency or constraint are we treating as someone else’s problem?
  8. Who experiences the unintended consequences of this decision?
  9. What early signal would tell us to stop or adapt?
  10. What is the smallest reversible test we can run before committing?

Ask for constructive challenge

Act as a constructive critical reviewer of this project decision: [proposal and supporting evidence].
Restate the strongest case for it. Separate facts, assumptions and missing information. Identify the three assumptions most likely to change the outcome. Explain the strongest counterargument, credible alternatives and unintended consequences. Describe how the approach could fail and the early signals we should watch. Ask for evidence rather than inventing it. State what would change your recommendation and suggest a small reversible test. Be specific, respectful and proportionate; do not agree automatically or manufacture objections. End with the decisions that remain with the human project leader.

06 / Keep your judgment in the loop

Responsible AI, in practice

  • Follow your employer’s AI policy and use approved tools and accounts.
  • Keep confidential project information and personal data out of unapproved systems. Share only the minimum necessary information.
  • Verify consequential claims, calculations and sources. A fluent answer or a citation is not proof.
  • Review generated work before using it. Check context, omissions and unintended commitments.
  • Keep human approval and accountability for decisions, communications and actions.

07 / Leadership beyond AI

Tools amplify capability. People still need leadership.

Leading Normal People by Michael Garrett — book cover

Leading Normal People

Michael Garrett

A practical guide to leading small teams in the real world, focused on trust, accountability, developing people and exercising judgment.

AI can help you prepare, analyze and organize. It cannot replace the leadership judgment required to support people and take responsibility for results.